Projects
Displaying results 1 to 7 out of 7
- 1
O2 Arena and Millennium Dome
The O2 Arena sits within the former Millennium Dome – one of Buro Happold’s key projects of the late 1990s as a building within a building.
Categories: Sports & Entertainment, Structural engineering, Fire engineering, Inclusive design, Geoenvironmental, United Kingdom
Library of Birmingham
2013 will be seen as a significant year for the City of Birmingham with the opening of Britain's biggest ever public library. Situated in the heart of the city adjacent to Centenary Square, the new complex will replace the...
Categories: Civic, Building services engineering, Structural engineering, Facades, Fire engineering, Lighting, Safe & secure, Computational analysis, Sustainability, SMART solutions, Acoustics, Inclusive design, Transport planning, United Kingdom
Arsenal Emirates Stadium
August 2006 saw the opening game at the 60,000-seat Emirates Stadium in London, the new home for Arsenal FC, one of Europe’s most prestigious and successful premiership football clubs. This opening game marked the beginning...
Categories: Sports & Entertainment, Structural engineering, Inclusive design, Safe & secure, SMART solutions, Building services engineering, Geotechnical, Geoenvironmental, United Kingdom
The Cube
Situated in Birmingham’s flourishing and vibrant Westside district, The Cube stands elevated and proud on an ever-evolving skyline. Inspired by the area’s origins as a jewellery quarter, this £76M high-end, mixed-use development...
Categories: Commercial residential, Retail, Structural engineering, Facades, Inclusive design, Geotechnical
University of Exeter Forum
Designed around the theme of assembly and open debate, the Forum will form a central part of the University of Exeter’s campus. The Forum Project will see several structures built or refurbished and enclosed under a stunning gridshell roof. As well as unifying these buildings and hosting a dramatic new reception, the roof will shelter a range of state of the art teaching and discussion spaces.
Categories: Education, Building services engineering, Structural engineering, Fire engineering, Sustainability, Safe & secure, Acoustics, Inclusive design, SMART solutions, People movement, Geotechnical, United Kingdom
London 2012 Olympic Stadium
Buro Happold worked as part of ‘Team Stadium’ an integrated design and construction team led by Sir Robert McAlpine to deliver the Stadium which, in legacy, will be a world-class athletics venue for the communities within London and beyond.
Categories: Sports & Entertainment, Structural engineering, Building services engineering, Fire engineering, Inclusive design, Safe & secure, Sustainability, Lighting, Computational analysis, Geoenvironmental, Geotechnical, United Kingdom
Baskerville House
Prior to refurbishment the Grade 11 listed Baskerville House in Birmingham remained unoccupied for several years. Buro Happold's refurbishment has created both quality office space and a gateway to the new...
Categories: Commercial office, Structural engineering, Inclusive design, Geotechnical, United Kingdom







